pyramid square 70a banner

Overview

Pyramid Infratech comes with their new commercial project Pyramid Square 70A in Sector 70A Gurgaon. The complex consists of most advanced ATM and affordable retail shops to cater to all your business needs in a modern way.  Pyramid Square 70A is spread over 35890 square feet as a part of 9.8 acres of Urban Homes affordable housing. And, it is one of the most sought after retail locations for the investment purpose. This magnificent commercial giant offers units starting from 134 sq.ft with a total of 108 and spread out over the ground floor and first floor, second floor, and third floor. Indeed, it is a perfect destination for mainstream brands and the combination of shopping of daily need goods.

Project Details
Total No. Of Shops 108
Ground Floor 34
First Floor 25
Second Floor 25
Third Floor 24
Sizes starts from 134 sq.ft
Location 70A

Located strategically at the prime spot of Gurgaon, with a daily rush over thousand of high-status people who will be your potential customers. These Retail units are crafted with world-class features and technology. Experts have designed Pyramid Square 70A the commercial development in Gurgaon near Southern Peripheral Road to exclusively cater to the needs of buyers and investors. As this development is surrounded by heavy residential projects like Supertech & DLF there will be no chance for footfalls in the retail shops.

Location Merits of Pyramid Square Sector 70A Gurgaon

  • Entry from 60 Meter & 25 Meter Wide Road
  • 2.5 Km from Golf Course.
  • Approx  4.1 Km from Vatika Chowk Sohna Road
  • Built on 24 Meter Road Connecting 60 Meter Road
  • Smooth and Uninterrupted connectivity with Sohna road, golf course Ext road & NH 8.
  • 30 Min drive from Indira Gandhi International Airport
  • Close IT Parks like Vatika Business Park
  • Schools, Hospitals, and the business zone of the city is in close proximity

Amenities

  • Sitting area
  • Parking provision
  • Speedy Elevators
  • High tech Security
  • Air-conditioned offices
  • Separate Service Elevator
  • Awesome management services 
  • Restaurant unit with open space

Specifications

PARKING
  • Ample Parking in front of the Shopping Centre
EXTERIOR
  • Combination of Glass ,Marbles Stone,Granite,Tiles & Painted Surface.
UNIT FINISH
  • RCC Slab, Plastered Walls.
WASHROOM
  • Finishes with Moderen Fittings & Fixtures.
STRUCTURE
  • Earthquake Resistant RCC Structure.
LANDSCAPE
  • Lush Green Landscape
INTERNAL
  • Main Lobby Equipped with tenant directory & directional sign.
EXTERNAL
  • Dedicated external signage as per standard design & conditions
FIRE SAFETY
  • 24 hrs security for common area with CCTV & Guard

Pyramid Sqaure 70A Location Map

pyramid square 70a location map

Floor Plans

ground floor plan pyramid square 70a
second floor plan square 70a
first floor plan pyramid sq70a
third floor plan sqaure 70a

Site Plan

sitemap square 70a

Pricing

Floor Type Basic Sale Price (70:30 Plan) Basic Sale Price (Down Payment Plan)
Ground 14,500 13,978
First 11,500 11,086
Second 10,250 9,881
Third 9 ,250 8,917
Additional Charges
Premium Shop PLC (Small unit) 10%
Premium Shop PLC (Large unit) 5%
Corner PLC 20%
EDC/IDC: As Applicable
Interest Free Maintenance Charges: 150 Rs. Per Sq.Ft.
Terrace Area ( Only Usable Rights) Rate: 50% of BSP
Electricity & Water Meter Charges As Applicable
Other Charges if Any + GST + Any Govt. Tax As Applicable

Pyramid Square 70A Payment Plan

70:30 Plan
On Booking 10%  (of BSP+PLC+ GST)
Within 45 days from Booking 60% (of BSP+PLC+ GST)
On possession 30% (of BSP+PLC) + IFMS + EDC/IDC + Electric & Water Meter Charges + Registration & Stamp Duty Charges
Down Payment Plan
On Booking 90% (of BSP+PLC)
On possession 10% (of BSP+PLC) + IFMS + EDC/IDC + Electric & Water Meter Charges + Registration & Stamp Duty Charges

Terms & Conditions:

  1. EDC & IDC are pro-rated per Unit as applicable. Any revision would be charged on pro-rata basis from
    the customers.
  2. Unit will be confirmed after receiving 1st Installment. DD/Cheque in Favor of ” Pyramid Infratech Pvt
  3. Goods and Services Tax is as per the prevailing regulation & rates and subject to change.
  4. Electricity, Water, Sewerage, and other Infrastructure Charges are yet to be determined by the company and will be payable by the customers at the time of handover.